MARCH 2015
PROJECT START DATE
project period
1 MONTHS
Commercial
Marine
Water Supply
The storage to quayside supply line delivers an impressive 280 tonnes per hour of potable water for ships berthed at Montrose.
The system will allow a minimum of 90 tonnes water supply to three ships simultaneously which we believe is unrivalled on the east coast of Scotland.
The investment is part of a continued commitment by MPA to offer the marine sector a one stop, rapid turnaround quality service.


The system was designed and constructed by Ferrier Pumps.
The project consisted of an extensive site survey and design; the removal of a redundant pump system; the supply, installation and commissioning of Duty/Assist/Assist variable speed booster sets with vertical multistage pumps and the supply, installation and commissioning of an ultrasonic level measurement system and electro-magnetic flowmeter
The new system provides a highly reactive, high volume ships water supply system that fully meets the requirements of both current and prospective shipping clients.